Season 2 · Episode 11
Fork the Fork
3 builds shipped in 30 minutes, live.
The brief
Last night everyone picked their own build to remix. Tonight we all remix the same one. The repo is https://github.com/air-planes/3rd-bass — it's public, so there's no asking around for access this time. Fork it and go. Ship a real improvement, then open a pull request back against the original repo. Your submission is that PR: link it, say what you changed, and how you built it. Submissions open 8:30PM CST and close 9:00PM CST. Tonight's prize: $20.
What “Fork the Fork” meant
Every CampAI episode sets one theme and one constraint: 30 minutes, live, with AI doing the heavy lifting. Season 2's builders took “Fork the Fork” in 3 different directions — the submissions below are what actually shipped inside the window, with the models used and the problems hit written up by the builders themselves.
Submissions